Description and requirements for obtaining the document:

Transportation, including transit, nuclear materials, radioactive materials, radio isotope sources of ionizing radiation, radioactive waste within the territory of the Republic of Kazakhstan

How it works:

Find the theme you want using the search bar or catalog
Download the list_of requirements_for obtaining permits for free
We have been assembling the database for over 1 year
to make sure you could get it in one spot
Transportation, including transit, nuclear materials, radioactive materials, radio isotope sources of ionizing radiation, radioactive waste within the territory of the Republic of Kazakhstan

Qualification requirements

Go to the normative document →
Issuing Authority:
Committee of Atomic and Energy Supervision and Control of the Ministry of Energy
Additional Approvals:
Not Required
National tax:
50 Monthly Calculation Index (184 600 tenge)
Order the document online on our platform
We will help you in obtaining all the documents required for a license
You don't need to go anywhere, all documents are submitted online
You can track the process of receiving the document in your personal account
A personal manager will be assigned to you, always ready to answer your questions
Selected document: Transportation, including transit, nuclear materials, radioactive materials, radio isotope sources of ionizing radiation, radioactive waste within the territory of the Republic of Kazakhstan
Are you a resident of the Republic of Kazakhstan?
Processing time:
1
Step 1. Preliminary verification of documents (the personal meeting with the UPPERLICENSE team is obligatory)
Term of Registration: 2 work days
Result: No - UPPERLICENSE recommendations for Step No 2. Preliminary verification of documents is undergone Yes - the client is served by the UPPERLICENSE company and-> transition to the Step 2.
2
Step 1.2. Check of measuring instruments and devices of radiation control (AO "Natsionalny center Ekspertizy i Sertifikatsii" Kapchagay, Almaty region)
Term of Registration: 10 work days
Result: Certificate of checking of measuring instruments and devices of radiation control.
3
Step 2. Payment of the state fee
Term of Registration: 1 work day
Result: Documents for subsidiary formation are under review with the Authority.
4
Step 3. Submission of documents on obtaining the license (personal presence is not required)
Term of Registration: 20 work days
Result: Documents are under consideration are under consideration in authorized body.
5
Step 4. Receipt of the original set of documents (personal presence is not required)*
Term of Registration: 1 work day
Result: Original License.
Service Cost: 3 000 000 tenge
Pre-Payment: 2 100 000 tenge (70% from the sum)
2 payment: 900 000 tenge (30% from the sum)