Reconciliation of the placement of enterprises and other facilities, as well as conditions for the production of construction and other works on water facilities, water protection zones and strips
Description and requirements for obtaining the document:
Reconciliation of the placement of enterprises and other facilities, as well as conditions for the production of construction and other works on water facilities, water protection zones and strips
How it works:
Find the theme you want using the search bar or catalog
Download the list_of requirements_for obtaining permits for free
We have been assembling the database for over 1 year to make sure you could get it in one spot
Selected subspecies
Reconciliation of the placement of enterprises and other facilities, as well as conditions for the production of construction and other works on water facilities, water protection zones and strips
Reconciliation of the placement of enterprises and other facilities, as well as conditions for the production of construction and other works on water facilities, water protection zones and strips
Issuing Authority:
Basin inspections for regulating the use and protection of Water Resources of the Committee on Water Resources of the Ministry of Ecology, Geology and Natural Resources of the Republic of Kazakhstan
Additional Approvals:
Not Required
National tax:
0 Monthly Calculation Index (0 tenge)
Order the document online on our platform
We will help you in obtaining all the documents required for a license
You don't need to go anywhere, all documents are submitted online
You can track the process of receiving the document in your personal account
A personal manager will be assigned to you, always ready to answer your questions
Selected document:Reconciliation of the placement of enterprises and other facilities, as well as conditions for the production of construction and other works on water facilities, water protection zones and strips
Are you a resident of the Republic of Kazakhstan?
Processing time:
1
Step 1. Preliminary verification of documents (the personal meeting with the UpperLicense team is obligatory)
List of documents
Electronic application form
Electronic copy of the decision of the local executive body of the region, the city of republican importance, the capital, the district, the city of regional importance on granting the right to land
Electronic copy of the master plan of the object
Electronic copy of technical conditions, or contract for water supply and drainage, in the absence of its own water intake
Electronic copy of the contract for the removal of sewage (in the absence of organized centralized sewerage of another system of diversion and treatment of contaminated wastewater)
An electronic copy of the sketch (sketch project) or explanatory note describing the planned activity
Electronic copy of an explanatory note describing planned activities
Electronic copy of design documents for mining, scientific recommendations for fish and reclamation and technical activities, forest management materials
Term of Registration:
2
work days
Result:No - UPPERLICENSE recommendations for Step No 2.Preliminary verification of documents is undergone
Yes - the client is served by the UPPERLICENSE company and-> transition to the Step 2.
2
Step 2. Submission of documents on notification of the authorized body (personal presence is not required)
List of documents
Electronic application form
Term of Registration:
10
work days
Result:The documents are under consideration by the authorized body.
3
Step 3. Receipt of the original set of documents (personal presence is not required)*
List of documents
* Power of attorney / Electronically digital signature (when applicable)
Term of Registration:
1
work day
Result:Original of permission.
Service Cost:500 000 tenge
Pre-Payment:350 000 tenge (70% from the sum)
2 payment:150 000 tenge (30% from the sum)
Order the paperwork and get it guaranteed and on time
Download a commercial offer with a detailed description of the service