Coordination of design and construction of duplicate (shunting) power transmission lines and substations
Issuing Authority:
epartment of Electric Power Industry Development
Additional Approvals:
Not Required
National tax:
0 Monthly Calculation Index (0 tenge)
Order the document online on our platform
We will help you in obtaining all the documents required for a license
You don't need to go anywhere, all documents are submitted online
You can track the process of receiving the document in your personal account
A personal manager will be assigned to you, always ready to answer your questions
Selected document:Coordination of design and construction of duplicate (shunting) power transmission lines and substations
Are you a resident of the Republic of Kazakhstan?
Processing time:
1
Step 1. Preliminary verification of documents (the personal meeting with the UPPERLICENSE team is obligatory)
List of documents
Electronic copy of the positive opinion of the local executive body on the technical feasibility of construction of duplicate (shunting) power transmission lines and substations for 110 kV and lower, 220 kV and higher facilities
Letters from relevant power-supplying, power-transmitting organizations about impossibility of supplying electric power to the consumer via existing electric networks
Statement in the form of an electronic document
Term of Registration:
2
work days
Result:No - UPPERLICENSE recommendations for Step No 2.Preliminary verification of documents is undergone
Yes - the client is served by the UPPERLICENSE company and-> transition to the Step 2.
2
Step 2. Submission of documents on notification of the authorized body (personal presence is not required)
List of documents
Electronic copy of the positive opinion of the local executive body on the technical feasibility of construction of duplicate (shunting) power transmission lines and substations for 110 kV and lower, 220 kV and higher facilities
Letters from relevant power-supplying, power-transmitting organizations about impossibility of supplying electric power to the consumer via existing electric networks
Statement in the form of an electronic document
Term of Registration:
21
work day
Result:Documents are under consideration are under consideration in authorized body.
3
Step 3. Receipt of the original set of documents (personal presence is not required)*
List of documents
* Power of attorney / Electronically digital signature (when applicable)
Term of Registration:
1
work day
Result:Original of the notice.
Service Cost:1 000 000 tenge
Pre-Payment:700 000 tenge (70% from the sum)
2 payment:300 000 tenge (30% from the sum)
Order the paperwork and get it guaranteed and on time
Download a commercial offer with a detailed description of the service